An overnight project to fill cracks and repave the 6000-foot surface of the Santa Barbara Airport's main runway will close the runway from midnight to 6 a.m. daily.
KCLU's John Palminteri reports on the changes to flight schedules as a result.
An overnight project to fill cracks and repave the 6000-foot surface of the Santa Barbara Airport's main runway will close the runway from midnight to 6 a.m. daily.
KCLU's John Palminteri reports on the changes to flight schedules as a result.